11/08/2026
One of two jobs we completed in Dunbar, the work we carried out was:
- Removing existing parting beads, baton rods, ropes and weights.
- Fitting new parting beads which include intergrated 8.5mm brush draft proofing.
- Fitting new baton rods which include intergrated 8.5mm brush draft proofing.
- Any rot repairs that’s needed to the case, half sills, pulley stile, outside facing etc.
- Making sure all windows operate as should adding any necessary weight if needed.
- Re Roping sashes with new wax sash cord.
- Sand Mastic Renewal on front windows.
- Fitting new brass ironmonger