04/09/2026
đźš§ Roof Coating Works Complete | Manchester
We finally got the break in the weather we needed to complete the first phase of our latest roof refurbishment project in Manchester.
The works included:
▪️ Full high-pressure cleaning and preparation
▪️ Removal of all failed and delaminating existing coatings
▪️ Mechanical abrasion and feathering back to a firm edge
▪️ Treatment of cut-edge corrosion
▪️ Treatment and replacement of loose/failed fixings
▪️ Installation of new sheets over previously failed repair areas
▪️ Full masking and protection of rooflights and Poppy Red fixing details
▪️ Application of the Drisilane Recoat 25-year specification
Preparation is everything when it comes to achieving a long-lasting roof coating system, and our team delivered this one to the standard we expect.
Smart Spray Solutions LTD