01/06/2026
πΏ Bathroom Transformation Completed πΏ
This bathroom was completely transformed in just 8 days from strip out to final completion.
The project involved a full rip out of the existing bathroom, with all fixtures, flooring and finishes removed. During the strip out, around half of the floor was found to be rotten and required replacement before installation could begin.
To make the new layout work, one wall was stripped back to brickwork to create the space needed for the bath installation. The soil stack was lowered to achieve the correct fall on the waste pipework, and the propertyβs stopcock was rerouted into the new WC unit for easy future access.
The layout was completely reconfigured, with the toilet, basin and towel radiator all relocated to maximise the available space and improve functionality.
β
Modern bath with black rainfall shower
β
Black smoked glass bath screen
β
Black vanity unit and basin mixer tap
β
Backlit round mirror
β
Designer towel radiator with concealed pipework
β
Waterproof wall panels throughout
β
New flooring throughout
β
Lowered ceiling with spotlights
β
Concealed pipework and improved access to services
β
Finished off by a silicone specialist for a clean, neat and professional finish
A huge transformation from the original bathroom, overcoming both structural and plumbing challenges to create a stylish, modern and practical space.
Big shout out to DM Electrics for the electrical work on this one β‘ Spot on from start to finish and a pleasure to work alongside as always π
Another happy customer and another quality bathroom completed π§πΏ
For bathrooms, plumbing, heating or electrical work, donβt hesitate to give us a message π©