11/10/2026
Was a long time coming getting this one started due to some planning and building control issues, but together we got there.
One of the toughest digs in the chalky clay ground combined with the heat this summer made for difficult digging, still we got dug out and poured within 3 days, all signed off by building control.
Drain is a temporary fix until we are back getting up to damp.
4 x loads of muckaway from this job and 10m³ concrete back in, with all jobs the foundations are the most important part for a solid build.
Always protect the driveway, makes cleaning up alot easier and it gets left how it looked the day you started, over 50 tonne of material come out on this, a concrete pump and lorry also sat on there.