27/09/2026
Reviving a lawn post-construction project and summer heat 🏡🌱☀️
Between heavy building work from a large extension and the scorching summer heat, this garden lawn was completely ruined.
The first photo shows the new lawn just 8 days after laying—taking root fast, settling neatly along the paved edges, and completely transforming the space.
It’s on track to be fully established and ready for its first light cut at the 3-week mark! ✂️✨
Swipe through to see the transformation:
1️⃣ The new lawn thriving after just 8 days.
2️⃣ Our team carefully laying the turf around the garden features and pond.
3️⃣ The prepped bare ground following the extension work and heat damage.
To guarantee the highest quality results for our clients, we partner with a premium local supplier for topsoil and turf.
Right now is the absolute perfect time to lay turf, as the soil conditions allow root systems to establish quickly before winter sets in! 🍂🌧️
Based in Hove or the surrounding areas and need your lawn brought back to life? Drop us a message today for a free quote! 💬👇