24/08/2026
That’s a wrap on this one.
Doesn’t look like a lot of work went into this but trust me there was. A silk painted artex ceiling with asbestos in it sanded, sealed and skimmed. Walls with 2 layers of Anaglypta Wallpaper plus another layer of wallpaper and finally painted with silk which all had to be stripped and sealed before re lining with Wallrock. Woodwork which had to be scraped back and sanded as it wasn’t primed prior painting.
It really did have the full works but I’m happy with the results and so too is the customer.
And now onto my last two externals of the year.
Thanks for looking folks!