05/03/2026
A busy few days at the office.
Removed all 4 of the old crumbling cement verges, only to find the previous roofer was a bit of a plonker and cut off the ends of all the tile battens. As a result gravity kicked in and everything sagged inwards.
I replaced the outer felt and all the tile battens holding everything up as it should.
Installed all new continuous dry verge (this stuff is awesome it has a hidden gulley built in and this takes the water down into the gutter) and a nice new ridge cap.
The chimney was a bit bushy, the cement was perished and the lead had fallen out.
A full grind out of the mortar and a full repoint was required as well as a new vent and a reflaunch of the top, finishing it off with some new shiny lead.
The ridges needed a spruce up too with a repoint of the whole length and a couple of them need to be rebedded too.
All sorted now with some very happy clients, Thank you so much for you patience. It was nice to get my first cement job of the year ticked off, let's hope the weather stays like this so I can tick off all the rest 🤞
Roof done ✔️
Knees ruined ✔️
Beers required ✔️