Reno One

Reno One Your Okanagan Valley Home Renovations Specialists

Transform your kitchen with quartz countertopsBefore & After Kitchen Quartz Countertops Subway tile  backsplashUnder cab...
02/21/2026

Transform your kitchen with quartz countertops
Before & After Kitchen
Quartz Countertops
Subway tile backsplash
Under cabinet lighting

Full tile shower. Sliding Glass Doors. 3 corner shelf. Grab barNew heated tile floor
02/21/2026

Full tile shower. Sliding Glass Doors. 3 corner shelf. Grab bar
New heated tile floor

Fiberglass Tub to Stone Shower
02/21/2026

Fiberglass Tub to Stone Shower

Galvanized Telescopic Dump Trailer Rental: Check us out!
11/02/2025

Galvanized Telescopic Dump Trailer Rental:
Check us out!

We have just added a new addition to our fleet and offer several different rental options.

If you like tile, our stone setters are ready to help.  Along with our licensed plumbers, we have got you covered!
10/27/2025

If you like tile, our stone setters are ready to help. Along with our licensed plumbers, we have got you covered!

Before and after bathroom remodel.  Removed the Window that was in the shower. Went Fiberglass surrounding the Tub.  Gla...
10/27/2025

Before and after bathroom remodel. Removed the Window that was in the shower. Went Fiberglass surrounding the Tub. Glass Doors. New Floor. New Vanity / New Medicine Cabinet . Budget between $8,000 - $10,000

Egress window in basement foundation. Once the window is backfilled and trimmed out on the exterior and framing and trim...
10/27/2025

Egress window in basement foundation. Once the window is backfilled and trimmed out on the exterior and framing and trim is done on the interior: Budget between $4,500 & $5,000 per window

This deck is ready for the hot tub!  Our Red Seal went above and beyond on this one.  Thanks Derek!
10/27/2025

This deck is ready for the hot tub! Our Red Seal went above and beyond on this one. Thanks Derek!

Framed and drywalled large commercial space.  28' Ceilings. Roof top HVAC, fully insulated rooms for ultimate climate co...
05/22/2025

Framed and drywalled large commercial space. 28' Ceilings. Roof top HVAC, fully insulated rooms for ultimate climate control.

This fence is on a slope and over time really started to shift and  lean as shown in before picture.  Some TLC and 40 ho...
05/22/2025

This fence is on a slope and over time really started to shift and lean as shown in before picture. Some TLC and 40 hours later we have built a small concrete block retaining wall, tied into pressure treated landscape logs. Spiked together and then drilled with rebar. Reclaimed the old fence boards. 4 new posts. Came out SOLID!

Tub/Shower Reno. Step 1: Demo: Remove Existing Metal Tub and existing flimsy plastic surround.  On this project there wa...
01/31/2025

Tub/Shower Reno.
Step 1: Demo: Remove Existing Metal Tub and existing flimsy plastic surround. On this project there was tile underneath.
Gut to the studs.
Step 2: Install New Tub ensuring level. Install New Delta valve and connect abs drain. Connecting the new drain will most likely require adjusting the positioning of existing drain. Access is a big consideration.
Step 3: Build Back: Drywall and Redguard the walls. Shim existing studs to insure level/plumb.
Step 3: Tile - Subway tile never goes out of style :)
A project like this takes 5 to 7 days.
Project Cost starts at $6,000 and up depending on materials chosen.

Address

4103 27th Street
Vernon, BC
V1T4X9

Alerts

Be the first to know and let us send you an email when Reno One posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category