08/30/2026
Below-grade entrance framing requires coordinated design, structural support, and permit compliance under OBC 2024.
A compliant installation should address:
✓ Structural opening dimensions, lintels, beams, and temporary or permanent support
✓ Stair geometry, guards, handrails, landings, and safe access
✓ Drainage, grading, waterproofing, and foundation-wall interfaces
✓ Door and window requirements where applicable, including operation and protection
✓ Fire separation and egress considerations for basement living areas or dwelling units
✓ Required inspections before work is concealed
✓ Construction alignment with the approved architectural and engineering drawings
The framing, entrance details, and site work should be coordinated before construction proceeds. Clear permit documentation helps support accurate inspections and compliant ex*****on.
Planning a below-grade entrance in Toronto, Brampton, Mississauga, Milton, Kingston, or anywhere in Ontario? DM “CODE”.
KeyDraft Designs serves all over Ontario.
4372258713 | [email protected]