WRC Contracting

WRC Contracting Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from WRC Contracting, Contractor, 4766 Kinburn Sdrd, Mississippi Mills, Rockland, ON.

WRC provides quality and client-focused construction services to help businesses and consumers complete their projects from their very first idea, to the very last finishing touch.

Excavation and Site work completed for 2 Duplex's πŸ‘πŸ»Rock Removals and Services installed, back for remainder of site wor...
04/09/2026

Excavation and Site work completed for 2 Duplex's πŸ‘πŸ»

Rock Removals and Services installed, back for remainder of site work in the upcoming weeks as progress on the project continues moving forward!

Traditional excavators or equipment would not fit or work for this site given the accessibility.But when the customer re...
12/02/2025

Traditional excavators or equipment would not fit or work for this site given the accessibility.

But when the customer requests armourstone stairs, we came up with a solution for the install! πŸ—οΈ

WRC has completed a lot of interesting jobs this summer utilizing the crane, it helps when you have a great operator on the crane aswell!

Thanks to for always coming out and helping us provide solutions for clients 🀝

Some pictures from various projects this fall πŸ“ΈThe team has pushed hard all year long, proud of them and the things we a...
11/28/2025

Some pictures from various projects this fall πŸ“Έ

The team has pushed hard all year long, proud of them and the things we are accomplishing.

The jobs and work load are still busy, we are pushing hard to complete projects before Santa comes! πŸŽ… πŸš‚

Installing some Sanitary sewer pipe and a man hole structure in order for the Municipality to be able to maintain the ex...
11/26/2025

Installing some Sanitary sewer pipe and a man hole structure in order for the Municipality to be able to maintain the existing sewer line πŸ‘πŸ»

Working on a busy street had traffic and logistical challenges, job went well from the first bucket taken until the final clean up.

Once excavation crews completed the work, sidewalks were prepped and formed.

WRC Concrete crew came in and had sidewalks poured and reopened with 24 hours!

Repairs and structural work taking place on the Bank Street Bridge, over the Rideau Canal!In order to gain access and co...
11/19/2025

Repairs and structural work taking place on the Bank Street Bridge, over the Rideau Canal!

In order to gain access and complete the work we had to build a "road" in the Canal using mud matts.

Once the mud matts are installed, scaffolding is set up on the matts and construction crews can begin repairs.

Working in the water comes with challenges and environmental concerns, WRC has converted our Excavator oil to Bio-Degradable Hydraulic oil in order to be able to accommodate engineer requests and requirements.

WRC enjoyed the challenge and logistics of working in the Canal, it's not everyday you get to fly your machine out of the Canal with a crane πŸ—οΈ

Looking forward to returning in a few months to remove the Matts and clean up the site πŸ€™πŸ»

1000FT of berm that we cut the grades down to meet engineer specifications.This berm did not meet the slope requirements...
10/17/2025

1000FT of berm that we cut the grades down to meet engineer specifications.

This berm did not meet the slope requirements that the engineers originally designed.

Using CAD Files and GPS Equipped Excavators we were able to cut it down grade, following the design of the engineered plans provided.

Once completed and verified, we returned to topsoil and Hydroseed.

Another job working with πŸ‘πŸ»

We always enjoy teaming up for projects πŸ€™πŸ»

10/03/2025

Fall is here, and we are gearing up for another busy snow season πŸš‚

A few highlights from last winter, excited for another season to come ❄️

Spent 2 days in Bancroft to prep and  finish reinstatement work to reopen the Paudash Bridge.Part of our scope of work i...
09/23/2025

Spent 2 days in Bancroft to prep and finish reinstatement work to reopen the Paudash Bridge.

Part of our scope of work included

-removing asphalt + hauling away

-removed existing gaurd rails

-supplying + installing gravel to tie existing grades into the new bridge

-providing a water truck and ride on roller for superior compaction

-installing rip rap on each side of the bridge for erosion control

-installing precast concrete block to protect the bridge ends

-final grades and prep before pavers arrived to site

It was a fast paced 2 days and we enjoyed the logistics and challenges of working out of town.

Bridge is open and passed final inspection with Zero Deficiencies.

Thankful for the crew working for us 🫑

Working locally at the Pakenham Public School πŸ“šNew Bollards and concrete pad installed to protect the Natural Gas servic...
09/19/2025

Working locally at the Pakenham Public School πŸ“š

New Bollards and concrete pad installed to protect the Natural Gas service!

Small project, but job went excellent and we are always thankful for the opportunity 🀝

Another year at the Almonte Fair 🎑Being born and raised in Almonte, the Fair has always been a special place to go year ...
09/15/2025

Another year at the Almonte Fair 🎑

Being born and raised in Almonte, the Fair has always been a special place to go year after year.

WRC is thankful for the opportunity to be able to volunteer and donate some of our time and equipment to help make the Fair special for others for years to come.

WRC is also very thankful for .motorsports for putting on the Demoltion Derby.

We enjoy setting up the ring, taking out the smashed cars and being able to run a few derby cars of our own πŸ€™πŸ»

Full road closure for replacing a 1400MM Culvert  🚧 -Worked with Mississippi Valley Conservation Authority to obtain a p...
09/13/2025

Full road closure for replacing a 1400MM Culvert 🚧

-Worked with Mississippi Valley Conservation Authority to obtain a permit to complete the work

-Worked with local municipalities and home owners to schedule the road closure

-Followed engineered drawings to complete the culvert install as per specifications

-Completed job with the budget and reopened road 6 Hours ahead of schedule

-Worked with pipe suppliers for delivery's

-Mobilized to site and completed work in the same day

Sawn Armourstone install πŸͺ¨ Installed sawn stone and some stairs to create a backyard patio area to enjoy at this cottage...
09/05/2025

Sawn Armourstone install πŸͺ¨

Installed sawn stone and some stairs to create a backyard patio area to enjoy at this cottage.

Customer had drawings and a design completed that well built the wall to specifications, it is going to be a nice project once all the other trades are done πŸ‘

Address

4766 Kinburn Sdrd, Mississippi Mills
Rockland, ON
K0A

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm
Saturday 8am - 2pm

Telephone

+16138533447

Alerts

Be the first to know and let us send you an email when WRC Contracting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to WRC Contracting:

Share

Category