Most homeowners walk into our shop thinking a custom kitchen takes two, maybe three weeks to build. Production alone runs four to eight.
That gap catches people off guard, and we get it. Big box timelines and renovation shows have trained everyone to expect fast. But a true custom kitchen isn't pulled off a shelf. It's drawn to your walls, cut from slabs we've selected for grain and colour, joined, sanded, finished, and cured before a single door ever hangs in your home.
Depending on the size of the project, that production window sits between four and eight weeks. Installation comes after that. Design, material sourcing, and template work happen before it.
The homeowners who love their finished kitchens the most are almost always the ones who started the conversation early. Not because they were in a rush, but because they gave the process the room it needed to be done properly 🪵
If you're thinking about a 2027 renovation in North Vancouver, now is a good time to talk. The wood doesn't hurry, and neither should the plan.