Green Infrastructure Partners

Green Infrastructure Partners Building Our Future

Brake-related violations remain one of the most common reasons commercial vehicles are placed out of service during insp...
08/27/2026

Brake-related violations remain one of the most common reasons commercial vehicles are placed out of service during inspections.

In alignment with the Commercial Vehicle Safety Alliance (CVSA), we focus on the importance of regular commercial vehicle inspections—especially when it comes to brake systems. These inspections play a critical role in identifying major defects and removing unsafe vehicles from our roadways.

Brake systems include components like:
• linings
• drums
• rotors
• hoses
• chambers
• slack adjusters
• pneumatic systems
—all of which can be affected by wear and tear or mechanical failure.

At GIP, we’re proud to support this inspection period as another opportunity to reinforce top-tier mechanical and safety practices. On behalf of our Fleet Compliance team, remember to stay diligent on all aspects of CVOR operation including brake inspections and maintenance:

✅ DO:
• Perform proactive maintenance and thorough pre-trip inspections, including visible portions of drums and rotors.
• Check rotors for excessive wear—especially if center vents are exposed.
• Look for cracks that extend to the outer portion of the drum or any missing pieces.

❌ DON’T:
• Skip over issues during inspections—always report concerns to your Operator.
• Forget to test cable emergency brakes to ensure they hold in both forward and reverse motion.
• Ignore heavily rusted rotors across the entire friction surface, as this may indicate an inoperative brake.

Safety first, always — one inspection at a time.
____

Les infractions liées aux freins restent l’une des causes les plus fréquentes de mise hors service des véhicules commerciaux lors des inspections.

En accord avec la Commercial Vehicle Safety Alliance (CVSA), nous soulignons l’importance des inspections régulières des véhicules commerciaux, en particulier en ce qui concerne les systèmes de freinage. Ces inspections jouent un rôle essentiel dans la détection des défauts majeurs et le retrait des véhicules dangereux de nos routes.

Les systèmes de freinage comprennent des composants tels que les suivants :
• Garnitures
• Tambours
• Disques
• Tuyaux flexibles
• Récepteurs
• Régleurs de semelle
• Systèmes pneumatiques
Ces éléments peuvent tous être endommagés par l’usure ou une défaillance mécanique.

Chez GIP, nous sommes fiers de soutenir cette période d’inspection, qui constitue une nouvelle occasion de renforcer nos pratiques mécaniques et de sécurité de premier ordre. Au nom de notre équipe responsable de la conformité des parcs de véhicules, nous vous rappelons de rester vigilants à l’égard de tous les aspects de l’IUVU (CVOR), y compris les inspections et l’entretien des freins :

✅ À FAIRE :
• Effectuer une maintenance proactive et des inspections approfondies, y compris des parties visibles des tambours et des disques, avant chaque trajet.
• Repérer toute usure excessive des disques, en particulier si les évents centraux sont exposés.
• Repérer toute fissure qui s’étend jusqu’à la partie extérieure du tambour ou toute pièce manquante.

❌ À NE PAS FAIRE :
• Ignorer les problèmes lors des inspections – toujours signaler vos préoccupations à votre opérateur.
• Oublier de tester les freins d’urgence pour s’assurer qu’ils fonctionnent correctement en marche avant et en marche arrière.
• Ne pas tenir compte des disques fortement rouillés sur toute la surface de friction, car cela peut indiquer un frein défectueux.

La sécurité d’abord, toujours – une inspection à la fois.

Over the past five years, GIP has been proud to support a major geotechnical and environmental drilling program located ...
08/25/2026

Over the past five years, GIP has been proud to support a major geotechnical and environmental drilling program located in Kitchener, Ontario on Bleams Road that helped move infrastructure and development projects from planning to construction.

Working alongside MTE Consultants, our team completed a comprehensive drilling investigation program to collect the environmental data needed to support project planning, engineering design, and risk assessment activities.

Programs like this play an important role in building a strong foundation for future infrastructure and communities, providing the information required to make informed decisions and deliver successful projects safely and efficiently.

A sincere thank you to our crews, clients, and partners for their trust and collaboration over the past five years. We look forward to continuing to support the infrastructure and developments that strengthen our communities.
____

Au cours des cinq dernières années, GIP a eu le privilège de participer à un important programme de forage géotechnique et environnemental sur la route Bleams à Kitchener, en Ontario. Ainsi, nous avons contribué à propulser des projets d’infrastructure et de développement du stade de la planification à celui de la construction.

En collaboration avec MTE Consultants, notre équipe a exécuté un programme complet d’investigations par forage afin de recueillir les données environnementales nécessaires à la planification des projets, à leur conception technique et à l’évaluation des risques.

Grâce aux informations recueillies qui permettent de prendre des décisions éclairées et de mener à bien les projets en toute sécurité et avec efficacité, ce type de programme joue un rôle essentiel dans l’établissement de bases solides pour les infrastructures et les communautés de demain.

Nous tenons à remercier sincèrement nos équipes, nos clients et nos partenaires pour leur confiance et leur collaboration tout au long des cinq dernières années. Nous nous réjouissons à l’idée de continuer à soutenir les projets d’infrastructure et de développement qui renforcent nos communautés.

Congratulations to our Shoring Operations and HSE teams for helping GIP earn the 2026 ADSC International Association of ...
08/20/2026

Congratulations to our Shoring Operations and HSE teams for helping GIP earn the 2026 ADSC International Association of Foundation Drilling Outstanding Safety Award.

This recognition highlights organizations that demonstrate a strong commitment to workplace safety through effective risk management, proactive safety initiatives, and a culture of continuous improvement.

Working in shoring and foundation construction comes with inherent risks, making this achievement especially meaningful. It reflects the dedication, leadership, and accountability shown by our teams every day to maintain a safe work environment.

We are incredibly proud of this accomplishment and grateful to everyone who plays a role in building and sustaining our strong safety culture at GIP.


____

Félicitations à nos équipes d’étayage et HSE qui ont permis à GIP de remporter un prix reconnaissant l’excellence en matière de sécurité décerné par l’International Association of Foundation Drilling Outstanding Safety Award (ADSC) en 2026.

Cette distinction met à l’honneur les organisations qui font preuve d’un engagement fort en faveur de la sécurité au travail grâce à une gestion efficace des risques, à des initiatives proactives en matière de sécurité et à une culture d’amélioration continue.

Les métiers du domaine de l’étayage et des fondations comportent des risques inhérents, ce qui rend cette réussite d’autant plus remarquable. Elle témoigne de l’engagement, du leadership et du sens des responsabilités dont font preuve nos équipes au quotidien pour garantir un environnement de travail sûr.

Nous sommes extrêmement fiers de cette réussite et reconnaissants envers toutes les personnes qui contribuent à instaurer et à maintenir une solide culture de la sécurité au sein de GIP.

Green Infrastructure Partners (GIP) is proud to be leading the construction of Phase 2 of the Eastern Kings Wind Project...
08/18/2026

Green Infrastructure Partners (GIP) is proud to be leading the construction of Phase 2 of the Eastern Kings Wind Project for the Prince Edward Island Energy Corporation.

Located in Eastern Kings, PEI, this expansion will add seven Enercon E138 wind turbines, generating 29.4 MW of clean, renewable energy—enough to help power thousands of Island homes while supporting PEI's transition to a more sustainable energy future.

Our team is delivering the inland transportation and installation of these 108-metre hub height turbines, coordinating the movement and assembly of major components from the Port of Georgetown to the project site. The scope includes turbine er****on, mechanical completion, and tower wiring.

This project comes with unique logistical and technical challenges, from coordinating variable component deliveries and managing limited staging space to executing specialized electrical work on the Enercon E138 turbines. Through collaboration, detailed planning, and the expertise of our crews, we're successfully overcoming these challenges every step of the way.

We're proud to play a role in advancing Canada's renewable energy future by delivering infrastructure that powers communities and supports a more sustainable tomorrow.
____

Green Infrastructure Partners (GIP) est fier de diriger les travaux de construction de la phase 2 du parc éolien de Kings-Est pour le compte de la Société de l’énergie de l’Île-du-Prince-Édouard.

Situé à Kings-Est, à l’Île-du-Prince-Édouard, ce projet d’expansion permettra d’ajouter 7 éoliennes Enercon E138 qui généreront 29,4 MW d’énergie renouvelable propre, soit suffisamment d’électricité pour alimenter des milliers de résidences sur l’île. Le projet s’inscrit en outre dans la transition de la province vers un avenir reposant davantage sur les énergies renouvelables.

Notre équipe assure le transport terrestre et l’installation des éoliennes, qui font 108 mètres de hauteur jusqu’au moyeu. Elle coordonne notamment le déplacement et le montage des principaux composants depuis le port de Georgetown jusqu’au chantier, y compris le montage des turbines, la mise en service mécanique et le câblage des éoliennes.

Ce projet présente des défis logistiques et techniques particuliers, allant de la livraison de composants de tailles variables ainsi que de la gestion d’un espace restreint pour la mise en place à la réalisation de travaux électriques spécialisés sur les éoliennes Enercon E138. Grâce à la collaboration, à une planification minutieuse et à l’expertise de nos équipes, nous parvenons à relever ces défis à toutes les étapes du projet.

Nous sommes fiers de contribuer à l’avenir du Canada en favorisant les énergies renouvelables et en bâtissant des infrastructures au service des collectivités et de la durabilité.

Since beginning early works in April, GIP has been advancing key project activities as part of the McGillivray Interchan...
08/13/2026

Since beginning early works in April, GIP has been advancing key project activities as part of the McGillivray Interchange Project, a major transportation infrastructure initiative on Winnipeg’s Perimeter Highway.

GIP is delivering the project under a design-build contract awarded in December 2025. The project includes the construction of a modern interchange at the intersection of the Perimeter Highway and McGillivray Boulevard, featuring a four-lane divided roadway and a two-lane overpass.

Working in collaboration with Manitoba Transportation and Infrastructure and project stakeholders, GIP is committed to delivering the project with a focus on safety, quality, and effective project management. Construction will continue in phases through the project's anticipated completion in 2030.

We are proud to support the Perimeter Freeway Initiative by delivering infrastructure that improves connectivity and keeps people, goods, and communities moving safely.
____

Depuis le début des travaux préliminaires en avril, GIP poursuit ses principales activités prévues dans le cadre du projet d’échangeur du boulevard McGillivray, une initiative majeure d’infrastructures de transport sur la route périphérique de Winnipeg.

GIP réalise ce projet dans le cadre d’un contrat de conception-construction conclu en décembre 2025. Le projet prévoit la construction d’un échangeur moderne à l’intersection de la route périphérique et du boulevard McGillivray comprenant quatre voies de circulation et deux ponts d’étagement.

En collaboration avec le ministère du Transport et de l’Infrastructure du Manitoba et les parties prenantes du projet, GIP s’engage à mener à bien ce projet en mettant l’accent sur la sécurité, la qualité et une gestion de projet efficace. Les travaux se dérouleront par phases jusqu’à l’achèvement du projet, prévu en 2030.

Nous sommes fiers de soutenir l’initiative de l’autoroute périphérique en réalisant des infrastructures qui amélioreront la connectivité et permettront une circulation fluide et sécuritaire des personnes, des marchandises et des collectivités.

We are proud to announce that the Mactaquac Improvement Partnership – comprised of Green Infrastructure Partners Inc., F...
08/12/2026

We are proud to announce that the Mactaquac Improvement Partnership – comprised of Green Infrastructure Partners Inc., Flatiron Dragados Canada Inc. and Aecon has been selected by the New Brunswick Power Corporation (NB Power) as the Preferred Proponent for the Development Phase of the Mactaquac Life Achievement Project.

This initiative is set to rehabilitate New Brunswick’s largest hydroelectric dam, which provides clean, reliable, low-cost power to communities across New Brunswick.

This multi-year project spans a wide range of work, including Structural Repairs, Mechanical & Electrical upgrades, helping secure the facility’s long-term performance for future generations.

For GIP, this project represents an opportunity to contribute our expertise, commitment to quality, and collaborative approach to an initiative that will contribute to New Brunswick’s long-term energy future.
____

Nous avons le plaisir d’annoncer que Mactaquac Improvement Partnership, un regroupement composé de Green Infrastructure Partners Inc., de Flatiron Dragados Canada Inc. et d’Aecon, a été choisi par la Société d’Énergie du Nouveau-Brunswick (Énergie NB) comme promoteur privilégié pour la phase de développement du projet d’atteinte de la durée de vie utile de la centrale de Mactaquac.

Cette initiative vise à moderniser le plus grand barrage hydroélectrique du Nouveau-Brunswick, qui fournit de l’électricité propre, fiable et à faible coût dans toutes les collectivités de la province.

S’étalant sur plusieurs années, ce projet prévoit un large éventail de travaux, notamment des réparations structurelles ainsi que des améliorations mécaniques et électriques, qui permettront de garantir le bon fonctionnement à long terme de l’installation pour les générations futures.

Pour GIP, ce projet est l’occasion de mettre à profit notre expertise, notre engagement à l’égard de la qualité et notre approche collaborative dans une initiative qui contribuera à l’avenir énergétique à long terme du Nouveau-Brunswick.

Hazard Awareness Never StopsHazards can appear when we least expect them. That's why taking time to identify and assess ...
08/11/2026

Hazard Awareness Never Stops

Hazards can appear when we least expect them. That's why taking time to identify and assess risks before starting work—and continually reassessing them as conditions change—is essential to keeping everyone safe.

At GIP, the Daily Hazard Assessment (DHA) is a key part of pre-start, new, or changing task preparation. This task-specific risk assessment tool helps teams review, identify, and discuss potential hazards before work begins and throughout the job.

Our 5 to Stay Alive framework reinforces this approach by reminding us to approach every task with care, intention and a mindset that is dynamic, just like the work environment itself.

The five key steps are:�
• Identify�
• Plan�
• Control�
• Inspect�
• Monitor

Whether a task is low or high-risk, these steps help workers recognize changing conditions, identify unplanned hazards, and make informed decisions in the field. By continually monitoring the work environment, we stay aware of new risks and take action before they become incidents.

Find the hazard before it finds you.

Photo credits: Tanika G, HSE Manager reviews DHA onsite. Duarte, one of our dedicated excavation team members takes time to discuss the importance of identifying and controlling workplace hazards.
____

L’évaluation des dangers : faire preuve de vigilance partout, en tout temps

Les dangers peuvent survenir lorsqu’on s’y attend le moins. C’est pourquoi il est essentiel, afin d’assurer la sécurité de tous, de prendre le temps de repérer et d’évaluer les risques avant le début des travaux, puis de les réévaluer régulièrement à mesure que les conditions évoluent.

Chez GIP, l’évaluation quotidienne des risques (EQD) constitue un élément clé du processus de préparation à toute nouvelle tâche ou à toute modification d’une tâche existante. Cet outil d’évaluation des risques spécifique à chaque tâche aide les équipes à évaluer et à repérer les dangers, puis à en discuter avant le début des travaux ainsi que tout au long de leur exécution.

Notre cadre de travail « 5 étapes pour rester en vie » renforce cette approche en rappelant qu’il faut aborder chaque tâche avec vigilance et détermination et avoir une mentalité dynamique, à l’image de la nature même de l’environnement de travail.

Les cinq étapes clés sont les suivantes :�
• Repérer�
• Planifier�
• Gérer�
• Inspecter�
• Surveiller

Que le risque lié à une tâche soit faible ou élevé, ces étapes permettent aux travailleurs de reconnaître l’évolution des conditions, de repérer les dangers inattendus et de prendre des décisions éclairées sur le terrain. En surveillant en permanence son environnement de travail, le personnel demeure ainsi informé des risques émergents et peut alors prendre des mesures pour prévenir les incidents.

Trouver le danger avant qu’il ne vous rattrape.

Crédit photo : Tanika G., gestionnaire HSE, examine l’EQD sur le chantier. Duarte, l’un des membres dévoués de notre équipe d’excavation, explique l’importance de repérer et de gérer les risques sur le lieu de travail.

One of the best ways to strengthen a Continuous Improvement Mindset is through hands-on learning and firsthand experienc...
08/06/2026

One of the best ways to strengthen a Continuous Improvement Mindset is through hands-on learning and firsthand experience.

To help bring this value to life, the Specialty Infrastructure group hosted the second annual In the Driver’s Seat workshop that gave our young engineers, managers, and coordinators valuable insight into our field operations.

The day started off with a Toolbox Talk on working around mobile equipment, where participants reviewed key hazards and safety considerations, setting the tone for a safe and informative afternoon.

Participants then stepped into the cabs of a hydraulic drill rig and lattice boom crane to understand blind spots and what the operator is watching for. They torch cut and welded steel during one of the hottest days of the year, as well as moved granular material using a skid steer and mini excavator. Everyone got up close to an operating tieback rig and learned how to tension a tieback.

Experiences like these prioritize safe work practices, offer valuable opportunities to learn from industry experts, strengthen critical trade‑focused decision‑making in the office and the field, and deepen overall understanding of infrastructure systems.

Thank you to everyone who helped make this workshop a safe and successful event.
____

L’apprentissage pratique et l’expérience concrète constituent l’un des meilleurs moyens de renforcer une culture d’amélioration continue.

Afin d’aider le personnel à incarner cette valeur, le groupe Infrastructures spécialisées a organisé la deuxième édition de l’atelier annuel intitulé « In the Driver’s Seat » (Au volant). Celui-ci a permis à nos jeunes ingénieurs, gestionnaires et coordonnateurs d’acquérir des connaissances précieuses sur nos opérations sur le terrain.

La journée a débuté par une pause sécurité sur les travaux à proximité d’équipement mobile. Les participants y ont passé en r***e les principaux risques et les consignes de sécurité, ce qui a donné le ton pour un après-midi à la fois instructif et résolument axé sur la sécurité.

Les participants sont ensuite montés dans les cabines d’une foreuse hydraulique et d’une grue à flèche à treillis afin de se faire une idée des angles morts et de ce que l’opérateur surveille. En outre, ils ont procédé à des découpes au chalumeau et à des soudures sur de l’acier lors de l’une des journées les plus chaudes de l’année, et ont également déplacé des matériaux granulaires à l’aide d’une chargeuse à direction à glissement et d’une mini-excavatrice. Tout le monde a pu observer de près une foreuse à ancrage en fonctionnement et a appris à mettre en tension un tirant d’ancrage.

De telles expériences favorisent l’adoption de pratiques de travail sécuritaires, offrent de précieuses occasions d’apprendre auprès d’experts du secteur, renforcent la prise de décision stratégique axée sur le métier, tant au bureau que sur le terrain, et permettent d’approfondir la compréhension globale des systèmes d’infrastructure.

Merci à toutes les personnes qui ont contribué à faire de cet atelier un événement réussi, en toute sécurité.

We’re proud to support critical water and wastewater infrastructure projects for Indigenous communities across Atlantic ...
08/04/2026

We’re proud to support critical water and wastewater infrastructure projects for Indigenous communities across Atlantic Canada.

GIP Technical Solutions Ltd. (New Brunswick branch) is currently subcontracted to:

- Supply Power and SCADA RTU Control Panels for the Pictou Landing First Nation Water and Wastewater Infrastructure Upgrades in Nova Scotia

- Supply SCADA RTU Control Panels for the Neqotkuk (Tobique) First Nation Community Wastewater Treatment Facility in New Brunswick

Both projects are led by the Atlantic First Nations Water Authority, whose leadership continues to advance sustainable, community-focused infrastructure.

This relationship building is an important step toward strengthening essential services and supporting long-term environmental stewardship in Indigenous communities.
____

Nous sommes fiers de soutenir des projets d’infrastructures hydrauliques essentielles et de traitement des eaux usées destinés aux communautés autochtones du Canada atlantique.

GIP Technical Solutions Ltd. (succursale du Nouveau-Brunswick) travaille en sous-traitance pour :

– fournir des panneaux électriques et des panneaux de commande de systèmes d’acquisition et de contrôle de données (SCADA) avec unités terminales distantes (RTU) dans le cadre des travaux de modernisation des infrastructures hydrauliques et de traitement des eaux usées de la Première Nation de Pictou Landing, en Nouvelle-Écosse;

– fournir des panneaux de commande de systèmes d’acquisition et de contrôle de données (SCADA) avec unités terminales distantes (RTU) pour l’installation de traitement des eaux usées de la Première Nation de Neqotkuk (Tobique), au Nouveau-Brunswick

Ces deux projets sont menés par l’Atlantic First Nations Water Authority, dont la direction continue de promouvoir des infrastructures durables et axées sur les communautés.

L’établissement de ces relations constitue une étape importante dans le renforcement des services essentiels et le soutien à une gérance à long terme de l’environnement au sein des communautés autochtones.

Happy National Intern Day!Today, we celebrate all the talented interns, co-ops, and students across GIP whose contributi...
07/30/2026

Happy National Intern Day!

Today, we celebrate all the talented interns, co-ops, and students across GIP whose contributions help strengthen our teams every day.

By applying classroom knowledge to real-world projects, they bring fresh perspectives, curiosity, and enthusiasm that make a meaningful impact across our business and help shape Canada's infrastructure landscape.

Hear directly from some of our students as they share their experiences and what they have learned during their time at GIP.

To our current and past interns, co-ops, and students: thank you. Your hard work, dedication, and commitment help drive our teams forward, and we are excited to be part of your journey.

Featured Students: Lauren Foley, Mirza Taimur Ali Baig, Lukas Van Oirschot, Selena Lancaster, Jack Day, Olivia Terlizzese, A***n Ratwani, Marco De Luca, Thurisan Sriskantharajah, Julia Shusterman, Oscar Creet



____

Bonne Journée nationale des stagiaires!

Aujourd’hui, nous célébrons l’ensemble des stagiaires, stagiaires coop et étudiants de talent au sein de GIP, dont les contributions contribuent chaque jour à renforcer nos équipes.

En mettant en pratique les connaissances acquises en classe dans le cadre de projets concrets, ils apportent un regard neuf, de la curiosité et de l’enthousiasme qui ont un impact significatif sur l’ensemble de notre entreprise et contribuent à façonner le paysage des infrastructures au Canada.

Découvrez les témoignages d’étudiants qui nous parlent de leurs expériences et de ce qu’ils ont appris chez GIP.

Merci à nos stagiaires, stagiaires coop et étudiants actuels et passés. Votre travail assidu, votre dévouement et votre engagement contribuent à faire avancer nos équipes, et nous nous réjouissons de vous accompagner dans votre parcours.

Étudiants en vedette : Lauren Foley, Mirza Taimur Ali Baig, Lukas Van Oirschot, Selena Lancaster, Jack Day, Olivia Terlizzese, A***n Ratwani, Marco De Luca, Thurisan Sriskantharajah, Julia Shusterman, Oscar Creet

Address

100 Commerce Valley Drive West
Markham, ON
L3T0A1

Telephone

+14166339670

Alerts

Be the first to know and let us send you an email when Green Infrastructure Partners posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Green Infrastructure Partners:

Share