11/27/2021
Like I have said before no job big or small! Here is a larger project that had alot of thought put into it. All the walls have been sanded and patched for painting, which included 2 full coats and a nice design cut into the living room ceiling. Since the bathroom gets so much moisture I did full coat of kilz primer and then 2 full coats of semi gloss.
Once that was all done it was time to move onto floors. All the floors you see in these pictures are glue down vinyl which is what I recommend. No shifting, no separating and the tile actually gets grouted in! Finishing everything off with properly caulked baseboards and it all comes together!
If you would like a paint job or floors installed at your home or business feel free to contact me anytime for an estimate!