Most renovation surprises are not bad luck. They are the result of a process that was never disciplined enough to prevent them.
Here is what we complete before a single wall opens:
✔ Every selection finalized ➡ All materials, from tile to fixtures and paint colours, are chosen in advance without allowances.
✔ Budget locked, no asterisks ➡ Every primary finish is confirmed so the budget can be locked without allowances.
✔ Permits secured ➡ All necessary legal permissions are in hand before mobilization.
✔ Engineering approved ➡ All structural and engineering drawings are finalized and signed off.
✔ Schedule confirmed ➡ The full timeline is established so you know exactly when the work will be done.
No decision should be made for the first time during construction. That is not a preference. It is a standard.