Installation day at Thirlmere β and the floor is going down. πͺ΅
After prep day β pouring self-levelling compound to bring the slab rooms up to tile height, and grinding the existing tiles ready for adhesion β everything was set. Today we're laying the engineered timber throughout the house and granny flat.
Glue-down installation across all the areas that were previously carpet. The existing tiles in the hallways, kitchen and dining stay in place β the new engineered planks tie the whole floor together seamlessly at the same level.
This is what all that prep work was for. When the subfloor is done properly, the installation goes smoothly. πͺ