CRL Australia

CRL Australia 🥇Industry leaders for over 65 years. 🧱Experts in all concrete needs. 🌏Improving infrastructure in the UK & AUS. 👇Make an inquiry
https://crl-aus.com

Kicking off the day before sunrise, laying down protective coatings and keeping this Melbourne bridge watertight!       ...
30/08/2026

Kicking off the day before sunrise, laying down protective coatings and keeping this Melbourne bridge watertight!

Surface sealed and ready. Preparations underway for the next one!
23/08/2026

Surface sealed and ready. Preparations underway for the next one!

Another look at our team strengthening the foundations of our infrastructure.A fresh membrane means better protection, l...
16/08/2026

Another look at our team strengthening the foundations of our infrastructure.

A fresh membrane means better protection, less damage, and a longer-lasting structures.

Here's a sneak peek at what goes into keeping this bridge in top condition.We're heating, applying, and securing a prote...
09/08/2026

Here's a sneak peek at what goes into keeping this bridge in top condition.

We're heating, applying, and securing a protective membrane that'll keep this bridge looking and performing its best for years.

Throwback to some of our best precision work at height!Our team carried out crack injection repairs to restore this conc...
02/08/2026

Throwback to some of our best precision work at height!

Our team carried out crack injection repairs to restore this concrete wall.



A look back at some of the major projects our team has been delivering throughout 2026. From large-scale infrastructure ...
26/07/2026

A look back at some of the major projects our team has been delivering throughout 2026.

From large-scale infrastructure to transport hubs and tunnel works, every project reflects the quality, precision and commitment CRL brings to the job.

Behind every successful structure is the detail you don’t always see. Our team is continuing waterproofing works on site...
12/07/2026

Behind every successful structure is the detail you don’t always see.

Our team is continuing waterproofing works on site, with membrane installation progressing across the base slab and wall junction areas.

From compartment detailing to penetrations and joint treatment, every stage requires precision, coordination and a strong focus on quality.

These photos capture the work that happens before the next construction stages can move forward - an important part of protecting the structure for long-term performance.

Well done to the team for their continued hard work on site.

Our Team continues to deliver high-quality waterproofing works with precision and attention to detail. Great progress on...
04/07/2026

Our Team continues to deliver high-quality waterproofing works with precision and attention to detail. Great progress on site this week!

Proud of the team’s effort and commitment to quality on every detail.

This week, our team continued works on the rooftop waterproofing system, with torch-applied membrane installation progre...
28/06/2026

This week, our team continued works on the rooftop waterproofing system, with torch-applied membrane installation progressing across the deck.

From surface preparation through to detailed membrane application, each stage is carried out with a strong focus on quality, durability, and long-term protection.

A great effort from the crew on site, making the most of every workable weather window - with even a rainbow making an appearance over

When the scale of the project speaks for itself.Our team continues to deliver large-scale waterproofing works on one of ...
20/06/2026

When the scale of the project speaks for itself.

Our team continues to deliver large-scale waterproofing works on one of Melbourne’s most significant infrastructure projects, with membrane installation, detailing and reinforcement works progressing across the structure.

Projects of this scale demand meticulous planning, precise ex*****on and close coordination between multiple trades.

From complex pit detailing through to extensive membrane installation and protection systems, every stage contributes to the long-term performance and durability of the asset.

It's great to see the project continuing to take shape, with quality and safety remaining at the forefront of every task undertaken on site.

A fantastic effort from everyone involved.

Address

Cathite House, 19 Venture Drive
Sunshine West
3020

Alerts

Be the first to know and let us send you an email when CRL Australia posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to CRL Australia:

Shortcuts

Share