Kooyong Lift Shaft 🔨
14 metres high across 4 floors in an existing 80 year old home
Our scope was to frame out between the structural steel and line the internal lift shaft with ply, all while working to extremely tight tolerances due to the minimal clearances required for the lift installation.
Every section needed to be framed straight, plumb and accurate from top to bottom, with no room for error.
We also had to replace the existing flooring at each lift entry point. Due to the age of the floorboards and how many times they had previously been sanded, toothing new boards into the existing floor simply wasn’t going to give us the finish we wanted.
Instead, we removed and replaced the full sections to achieve a cleaner, stronger and more consistent result.
A technical job with plenty of planning, precision and attention to detail throughout.