DRW Carpentry And Maintenance.

DRW Carpentry And Maintenance. Darren is a fully licensed carpenter. He can help you with jobs around your home and if he can't he’ll refer you to someone who can. Fully insured and licensed.

Lic no - 15744C.

Operating as usual

31/12/2021

We hope you all have a great 2022.

22/12/2021

Dash is now finished for 2021. Thanks for a great year and we’ll see you back here on the 10th January. Happy, safe Christmas to you all.

We finally got rid of the Handyman Dash sticker and popped the new one on.
21/12/2021

We finally got rid of the Handyman Dash sticker and popped the new one on.

We finally got rid of the Handyman Dash sticker and popped the new one on.

17/12/2021

Dash was back at Adina’s for a couple of hours early this morning to finish off the staining on the spa deck, right at the front door, check over everywhere else and pop furniture back before the ladies arrived to start their day then was off doing some maintenance work for the builder.
He also found out that there was a shortage of material late last week and we’d hoped that the large balustrade job he is meant to finish 2021 with, was going to make it through but we had that dreaded call and no it won’t get finished this year which is a real shame. We’re just thankful we have such understanding clients lately but as soon as it arrives, even if we’re on holidays we’ll be back to do it.

Dash has been back at Adina’s this week. Cleaning the decks of the day spa unit, staining and replacing decking boards t...
16/12/2021

Dash has been back at Adina’s this week. Cleaning the decks of the day spa unit, staining and replacing decking boards that will be now left to weather till late in January. He’ll then be back to stain them along with more work on other units.

A larger ezi-slat screen area done today. Came up very well and owner couldn’t believe how much bigger the area looks on...
14/12/2021

A larger ezi-slat screen area done today. Came up very well and owner couldn’t believe how much bigger the area looks once done.

Another ezi-slat system installed. This one is at home. Look forward to seeing our client’s one done this week. It has a...
13/12/2021

Another ezi-slat system installed. This one is at home. Look forward to seeing our client’s one done this week. It has arrived.

This lawn has Coochie attend to it every 8 weeks. Dash just waters and mows it. What once used to be mown on a level 3 n...
12/12/2021

This lawn has Coochie attend to it every 8 weeks. Dash just waters and mows it. What once used to be mown on a level 3 now is so thick it is mown on level 6. Even the standard roses are popping out of their skins. We’re very happy with the results after only 2 treatments. https://m.facebook.com/CoochieHydroGreenNewcastle/

Our client had a flyover patio and wanted someone to add some protection between the patio roof and roof of the home, fr...
08/12/2021

Our client had a flyover patio and wanted someone to add some protection between the patio roof and roof of the home, from the rain and wind. Dash used twin wall polycarbonate and they have certainly noticed the difference.

02/12/2021

Darren had a great few days working on all timber work for one of the units out at Adina vineyard. Even I was his labourer yesterday.
He’ll be back there for another stint in a fortnight then into the new year.

What a location to be working at this week. Dash is attending to all the decks at the accomodation at Adina vineyard.
30/11/2021

What a location to be working at this week. Dash is attending to all the decks at the accomodation at Adina vineyard.

Wall with door, all complete and painted now
19/11/2021

Wall with door, all complete and painted now

I did end up getting my ezy-slat screen and I love it. Was a job for the weekend but with this rain and an earlier finis...
11/11/2021

I did end up getting my ezy-slat screen and I love it. Was a job for the weekend but with this rain and an earlier finish, Dash has completed it now

Last week there were walls removed and this week Dash is building a wall
11/11/2021

Last week there were walls removed and this week Dash is building a wall

08/11/2021

Looks like 2021 is booked out after a couple more quotes have been accepted today. Dash will definitely enjoy his break at Christmas time. We will be closed between 24th December - 9th January, starting back on the 10th January 2022.

A couple of walls were removed from a home yesterday to open the room right up. Owners were pretty happy to see end resu...
04/11/2021

A couple of walls were removed from a home yesterday to open the room right up. Owners were pretty happy to see end result. They’ll keep going with reno’s around this room now.

31/10/2021

Love receiving positive feedback for our small business
“Fantastic job Darren. I’m absolutely over the moon with our new deck. I can’t recommend your work highly enough mate.”
Hope you guys get many years out of this lovely deck too.

He’s even had a wash and still filthy. The joys of working with hardwood and it’s oils, sap, etc.
29/10/2021

He’s even had a wash and still filthy. The joys of working with hardwood and it’s oils, sap, etc.

He’s even had a wash and still filthy. The joys of working with hardwood and it’s oils, sap, etc.

Very nice end result with this deck. 9m x 3.1m with 2 steps on 2 sides. Owner has said this is exactly what they were af...
29/10/2021

Very nice end result with this deck. 9m x 3.1m with 2 steps on 2 sides. Owner has said this is exactly what they were after. It’ll be left to weather now and then be stained/ oiled by owner.

Looking really good. Back tomorrow to finish the deck and add extra roofing down the far end
28/10/2021

Looking really good. Back tomorrow to finish the deck and add extra roofing down the far end

27/10/2021

A couple of suppliers are holding us up on our quotes. Please bare with us whilst we wait to hear back from them.

The starts of the deck today. Some more work on the structure tomorrow and then the decking boards will start.
26/10/2021

The starts of the deck today. Some more work on the structure tomorrow and then the decking boards will start.

25/10/2021

Deck week this week. It’s an existing deck which will have some modifications and a different timber used. Merbau will be used now. Look forward to seeing this one unfold.

Another day on the studio. Roof all set for sheeting.
21/10/2021

Another day on the studio. Roof all set for sheeting.

Dash was asked to do 2 days of work on this studio. Last day is today.
20/10/2021

Dash was asked to do 2 days of work on this studio. Last day is today.

20/10/2021

We have had many inquiries this week, quotes happening and more to come. Everyone getting on to their jobs so they’re ready for Christmas. We’ll get back to you all very soon.

The weather has slowed things a little this week but this is one of the jobs completed. Stratco ezi - slat screening wit...
14/10/2021

The weather has slowed things a little this week but this is one of the jobs completed. Stratco ezi - slat screening with a river gravel garden underneath. Another job done for some of Dash’s regulars.

07/10/2021

Doors galore replaced this week for 2 of our regulars. 10 in total. Out with the old and in with the new.

An up and coming job. So many sleepers to complete this job. Watch this space.
30/09/2021

An up and coming job. So many sleepers to complete this job. Watch this space.

Area all finished now. Retainer wall done to level area, fence added at top of wall and all paved now. Trampoline one en...
23/09/2021

Area all finished now. Retainer wall done to level area, fence added at top of wall and all paved now. Trampoline one end, chess in the middle and basketball hoop at the other. Chess set now ordered and it’ll look great.

Another job done for our regulars. This garden bed has been prepared ready for citrus trees to be planted.
20/09/2021

Another job done for our regulars. This garden bed has been prepared ready for citrus trees to be planted.

Dash is back with regulars, this week and next week. A retainer wall has been built to level out the area, a cream alumi...
16/09/2021

Dash is back with regulars, this week and next week. A retainer wall has been built to level out the area, a cream aluminium fence has been added to the top of this wall and then paving will be completed to the full area. It will be a nice flat area for the kids.

21/06/2021

Back with one of his regular businesses tomorrow for the rest of the week. It’ll be indoor work for Dash. Painting, fixing a wall up, plastering, extending a desk and more.

Address

East Branxton, NSW
2335

Telephone

+61401107443

Alerts

Be the first to know and let us send you an email when DRW Carpentry And Maintenance. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to DRW Carpentry And Maintenance.:

Category

Nearby contractors


Other East Branxton contractors

Show All

Comments

Thanks Dash. This guy is amazing. He painted my house (inside) last week. Great worker and tidy. Highly recommend you.