18/07/2026
Mineconnect on the road again!
Mineconnect was approached by Greenlands Equipment to assist with their dewatering project. On very short notice, our team arrived onsite to install their telemetry pumping system.
With the system now in place, 6 bore pumps are controlled autonomously via telemetry. The master control unit at the transfer station communicates with all 6 pumps in the field — starting and stopping them while monitoring the transfer tank level — to efficiently dewater the site and maximise project output.
Great work by the team for turning this around so quickly! 💪